Verified calculation capability
Assumed-CCM buck peak-to-peak inductor ripple ΔI_L,pp and optional capacitor-only ΔV_C,pp (ESR=0). · Electrical · Buck
Capability ID electrical.buck.ripple · version 1.1.0
Inductor ripple (peak-to-peak)
ΔI_L,pp = Vout·(1−D)/(f_SW·L)ΔV_C,pp ≈ ΔI_L,pp/(8·f_SW·Cout)I_out,crit = ΔI_L,pp/2Canonical symbols for this capability. Agent schemas remain the contract.
| Symbol | Quantity | Unit | Role |
|---|---|---|---|
Vin | Input voltage Vin (V) | V | input |
Vout | Output voltage Vout (V). Must be strictly less than Vin. | V | input |
f | Switching frequency f_SW (Hz) | Hz | input |
L | Inductance L (H) | H | input |
C | Optional output capacitance Cout (F). Omit to report inductor ripple only. If present, must be > 0. | F | input |
D | Ideal CCM duty cycle D = Vout/Vin (dimensionless). Assumed, not measured. | — | output |
dI_L | Peak-to-peak inductor current ripple ΔI_L,pp (A). Not RMS, not amplitude, not ±peak. | A | output |
dV_out | Peak-to-peak output capacitor voltage ripple ΔV_C,pp with ESR neglected (V). Capacitor-only; omitted when C_F is omitted. Not total converter output ripple including ESR. | V | output |
I_ccm_boundary | CCM boundary load current ΔI_L,pp/2 (A). Ideal CCM requires Iout greater than this value. This calculator does not take Iout and does not certify operating mode. | A | output |
dV_over_Vout | Capacitive ripple ratio ΔV_C,pp / Vout (dimensionless). Present only when C_F is provided. | — | output |
assumption | Operating-mode assumption. Not a measured CCM/DCM decision. | — | output |
Declared scope for this capability. Do not use it outside this domain.
Assumptions
Not supported
One numerical check. The calculator page holds worked steps and FAQ.
12 V→5 V, 100 kHz, 10 µH, 100 µF → ΔI_L,pp=2.9167 A, ΔV_C,pp=36.46 mV
CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance. Computational verification is defined by CVP. Supplemental domain review (internal) and named expert review are defined by the Review policy and do not by themselves determine CVP conformance.
Human page, REST, and MCP share the same engine and calculation_version.
Build verified hashes workspace artifacts only. After deploy, attest:production GETs canonical URLs twice — the public/cached view an Agent actually hits, and origin — including every /capabilities/{id} HTML page. Public Capability HTML version must match catalog before production attestation passes. Live Trust rows above fetch /.well-known/calculatorx-production-attestation.json
and the output schema const. Build hashes: release integrity. That proves currently published page / engine / schema / evidence / MCP agree — not that a historical version is independently immutable. Reference Calculation Standard — Production surface contract 4/4.
Human-readable sources plus CVP reference evidence classes.
Sources
Reference evidence classes: O1 model · O2 expected_values · O2 numerical_behavior
Inspect this capability via same-origin MCP, then call execute_calculation.
curl -sS -X POST 'https://www.calculatorx.com/mcp' \
-H 'Content-Type: application/json' \
-H 'MCP-Protocol-Version: 2026-07-28' \
-H 'Mcp-Method: tools/call' \
-H 'Mcp-Name: inspect_capability' \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"inspect_capability","arguments":{"capability_id":"electrical.buck.ripple"}}}'
Inspect the trust tier and required assurance level before execution. Pin calculation_version (1.1.0) when reproducibility matters. Full protocol notes: MCP docs.