Verified calculation capability
Combine gain/offset/INL/DNL into LSB, volts, and %FS. · Electrical · Adc
Capability ID electrical.adc.error_budget · version 1.0.0
LSB
LSB = FSR / 2^nerr = √(g²+o²+INL²+DNL²)err = |g|+|o|+|INL|+|DNL|Canonical symbols for this capability. Agent schemas remain the contract.
| Symbol | Quantity | Unit | Role |
|---|---|---|---|
n_bits | Integer ADC resolution in bits. | — | input / output |
FSR | Total analog input span in volts, not necessarily VREF. For a 0–3.3 V ADC, FSR_V = 3.3; for ±2.5 V, FSR_V = 5. | V | input / output |
gain_err_LSB | Gain error already referred to LSB. | — | input |
offset_err_LSB | Offset error already referred to LSB. | — | input |
inl_LSB | Integral nonlinearity already referred to LSB. | — | input |
dnl_LSB | Differential nonlinearity already referred to LSB. CalculatorX includes DNL as a separate RSS/worst-case contributor. | — | input |
combine | rss treats contributors as independent/uncorrelated and is an engineering estimate, not a guaranteed bound. worst_case sums absolute LSB terms. | — | input / output |
LSB | — | V | output |
err_LSB | — | — | output |
err | — | V | output |
err_pct_FS | — | — | output |
Declared scope for this capability. Do not use it outside this domain.
Assumptions
Not supported
One numerical check. The calculator page holds worked steps and FAQ.
12-bit 3.3V · RSS(1,0.5,1,0.5) → ≈1.58 LSB
CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance · static DC LSB error-budget calculation. Computational verification is defined by CVP. Supplemental domain review (internal) and named expert review are defined by the Review policy and do not by themselves determine CVP conformance.
Human page, REST, and MCP share the same engine and calculation_version.
Build verified hashes workspace artifacts only. After deploy, attest:production GETs canonical URLs twice — the public/cached view an Agent actually hits, and origin — including every /capabilities/{id} HTML page. Public Capability HTML version must match catalog before production attestation passes. Live Trust rows above fetch /.well-known/calculatorx-production-attestation.json
and the output schema const. Build hashes: release integrity. That proves currently published page / engine / schema / evidence / MCP agree — not that a historical version is independently immutable. Reference Calculation Standard — Production surface contract 4/4.
Human-readable sources plus CVP reference evidence classes.
Sources
Reference evidence classes: O1 model · O2 expected_values · O2 numerical_behavior
Inspect this capability via same-origin MCP, then call execute_calculation.
curl -sS -X POST 'https://www.calculatorx.com/mcp' \
-H 'Content-Type: application/json' \
-H 'MCP-Protocol-Version: 2026-07-28' \
-H 'Mcp-Method: tools/call' \
-H 'Mcp-Name: inspect_capability' \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"inspect_capability","arguments":{"capability_id":"electrical.adc.error_budget"}}}'
Inspect the trust tier and required assurance level before execution. Pin calculation_version (1.0.0) when reproducibility matters. Full protocol notes: MCP docs.