Home Developers Evidence electrical.kwh_to_watts

Public evidence

electrical.kwh_to_watts

Machine-checked verification for calculation version 1.2.1 · tier engine_tested

Verification

12/12 calculation tests · Production surface contract 4/4

  • Golden tests 12 / 12
  • Boundary tests 0 / 0
  • Property tests 0 / 0
  • Production surface contract 4 / 4
  • }
  • Engine tested Yes
  • Source checked Yes
  • Artifact integrity PASS
  • Production attestation Embedded snapshot: STALE · Last attested schema matched 1.2.1 snapshot / local build · Semantic contract ✓ · Last attestation PASS · current evidence changed · re-attestation required · Public/cache ✓ · Origin ✓ · Live production status PASS (0 stale; 164 CURRENT) @ 2026-09-16T06:44:24.909Z
  • Semantic contract PASS
  • Evidence attested at 2026-09-16T06:44:24.203Z
  • Last production check 2026-09-16T06:44:24.203Z
  • Public / cache PASS
  • Origin PASS
  • Supplemental domain review Not performed
  • Named expert review Not performed
  • release artifacts aligned PASS
  • schema valid input executes PASS
  • engine success output validates schema PASS
  • schema rejects incomplete input PASS

Fingerprint sha256:2f1243deb47ae5d58324b74d1c5a729429371ccd16a27ccbd6e28b9b5b375e05

Input schema sha256:36e03de4cc6a5f64bdde21771eed9c9ef1588b32cd0bf841ea44730e408d23cb · Output schema sha256:ebe8b63eb3d9e96be3160fd6e10cb21f9aca1d8ca48e6fefe6f1a2c5f3f91e75 · Build-time SHA-256 digests prove published artifacts agree with each other (release_integrity.scope=workspace). Production attestation GETs canonical URLs twice (public/cached view and origin), including Capability HTML, via npm run attest:production --write (published at /.well-known/calculatorx-production-attestation.json) and fails if the public Capability page advertises a different calculation_version. This is artifact consistency, not an independent immutable release log.

Build & scope

Engine identity and declared limitations.

Tool
kwh-to-watts
Engine
scale-quotient
Engine build
2026-09-15
Evidence core
2026-09-15T06:31:46.555Z
Rendered
2026-09-16T22:03:43.707Z
Last reviewed

Assumptions

  • Power is the average over the stated period
  • Time is expressed in hours

Limitations

  • Average power over the interval — not instantaneous peak
  • Time must be in hours
  • Shares the scale-quotient helper with W→kVA; contracts are distinct (time vs PF)

Sources

Standards and references supporting this tool specification. Methods are listed separately — they are algorithms, not bibliographic sources.

Published checks

Golden, boundary, and property cases included in this evidence build.

IDKindStatusDetail
1kWh-1hgoldenpassExpected 1000 · Actual 1000
3-6.5goldenpassExpected 461.538 · Actual 461.53846153846155
12-24goldenpassExpected 500 · Actual 500
w-to-kwhgoldenpassExpected 7.5 · Actual 7.5
10-5goldenpassExpected 2000 · Actual 2000
1000W-1h-reversegoldenpassExpected 1 · Actual 1
linear-2x-EgoldenpassExpected 923.077 · Actual 923.0769230769231
inverse-half-tgoldenpassExpected 923.077 · Actual 923.0769230769231
soft-zero-tgoldenpassExpected 0 · Actual 0
soft-zero-EgoldenpassExpected 0 · Actual 0
soft-zero-P-reversegoldenpassExpected 0 · Actual 0
soft-zero-t-reversegoldenpassExpected 0 · Actual 0