Home Developers Evidence electrical.watts_amps

Public evidence

electrical.watts_amps

Machine-checked verification for calculation version 1.4.1 · tier engine_tested

CVP: CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance· DC / 1φ / 3φ LL · Protocol · Schema · Production report

Declared partition coverage
PASS · 2/2 declared partitions (watts-amps, invalid-domain)
Versions
Calculation 1.4.1 · CVP protocol 1.0.0-proposed
CVP identity
8/8 property · digest 8b431c133176

Verification

Legacy regression suite: 24/24 calculation tests · Production surface contract 4/4

Three distinct suites: educational examples on the calculator page, this legacy regression count (24/24 golden + boundary), and the CVP verification suite below. They are not the same number. Property, metamorphic, round-trip, O3, and interface statuses/checks are recorded in the CVP Manifest . SKIP (0/0) means that suite has no published vectors.

    This calculator CURRENT · Public schema 1.4.1 matches · Semantic contract ✓ · Production attested · Public/cache ✓ · Origin ✓

CVP verification suite

Protocol checks from the Evidence Manifest. Distinct from the legacy regression suite above. Calculation version 1.4.1. CVP 1.0.0-proposed. 1/1 golden · 4/4 CVP boundary · 2/2 invalid · 8/8 property · 1/1 cross-interface · 1/1 CVP contract. digest 8b431c133176.

  • Golden (oracle-backed) 1 / 1
  • CVP boundary 4 / 4
  • Invalid input 2 / 2
  • Property 8 / 8
  • Cross-interface 1 / 1
  • CVP contract 1 / 1
  • Interfaces PASS · UI (SSR) / REST / MCP
  • Interface claim ui-ssr is query-result HTML, not a live browser session.
  • Assurance Engineering
  • release artifacts aligned PASS
  • schema valid input executes PASS
  • engine success output validates schema PASS
  • schema rejects incomplete input PASS

Fingerprint sha256:465de46099024f3f0720f1da017640210ce5a53c84a1b15ba9e7cd2c4b68f2d3

Input schema sha256:c81941dfc9e2bdc8d5f422b5af389c2e47a9e6c6420d547e1f8ea49b4bff2cdb · Output schema sha256:fbed785a3393b689760e84859b8c45ae7bdbc696a9f826b9c83e0684d3fd3958 · Build-time SHA-256 digests prove published artifacts agree with each other (release_integrity.scope=workspace). Production attestation GETs canonical URLs twice (public/cached view and origin), including Capability HTML, via npm run attest:production --write (published at /.well-known/calculatorx-production-attestation.json) and fails if the public Capability page advertises a different calculation_version. This is artifact consistency, not an independent immutable release log.

Build & scope

Engine identity and declared limitations.

Tool
watts-to-amps
Engine
watts-amps
Engine build
2026-09-10
Evidence core
2026-09-10T22:48:17.762Z
Rendered
2026-09-16T22:03:43.699Z
Last reviewed

Assumptions

  • Balanced three-phase when 3φ (L-L) is selected.
  • Voltage and current are RMS for AC.
  • DC forces PF = 1; AC uses total power factor λ on real power.

Limitations

  • Not for unbalanced three-phase
  • Not for line-to-neutral three-phase as a separate mode
  • Not a substitute for breaker or conductor sizing

Sources

Standards and references supporting this tool specification. Methods are listed separately — they are algorithms, not bibliographic sources.

Legacy published checks

Golden and boundary cases from the legacy Evidence JSON. CVP property, metamorphic, round-trip, O3, and interface statuses/checks are recorded in the Manifest — including SKIP when a suite has no vectors.

IDKindStatusDetail
dc-1000W-120VgoldenpassExpected 8.333 · Actual 8.333333333333334
dc-2400W-240VgoldenpassExpected 10 · Actual 10
1phi-2000WgoldenpassExpected 22.727 · Actual 22.727272727272727
3phi-10000WgoldenpassExpected 16.04 · Actual 16.037507477489605
dc-60W-12VgoldenpassExpected 5 · Actual 5
dc-amps-to-wattsgoldenpassExpected 1500 · Actual 1500
1phi-2000W-230VgoldenpassExpected 10.87 · Actual 10.869565217391305
dc-linear-2x-powergoldenpassExpected 16.667 · Actual 16.666666666666668
soft-zero-voltsgoldenpassExpected 0 · Actual 0
soft-zero-powergoldenpassExpected 0 · Actual 0
soft-pf-zero-as-onegoldenpassExpected 18.182 · Actual 18.181818181818183
3phi-roundtrip-a-wgoldenpassExpected 10000 · Actual 10001.554183225724
boundary-pf-zero-as-oneboundarypassExpected 18.181818181818183 · Actual 18.181818181818183
boundary-zero-volts-acboundarypassExpected 0 · Actual 0
boundary-missing-voltsboundarypassExpected MISSING_REQUIRED_INPUT · Actual MISSING_REQUIRED_INPUT
boundary-neg-voltsboundarypassExpected VOLTAGE_MUST_BE_POSITIVE · Actual VOLTAGE_MUST_BE_POSITIVE
property-dc-w-apropertypassDC: I = P/V
property-dc-a-wpropertypassDC: P = I·V
property-dc-roundtrippropertypassDC W↔A round-trip
property-1phi-pfpropertypass1φ: I = P/(V·λ)
property-linear-powerpropertypassI(2P)=2I(P) at fixed V
property-3phi-pfpropertypass3φ: I = P/(√3·V·λ)
property-3phi-roundtrippropertypass3φ W↔A round-trip
property-inverse-vpropertypassI(2V)=I/2 at fixed P