Home Developers Capabilities Energy cost

Verified calculation capability

Energy cost Calculation Capability

Estimate electricity cost from watts/hours or kWh and a unit rate. · Electrical

Capability ID electrical.energy_cost · version 1.4.2

Model

Cost from energy

Inputs / Outputs

Canonical symbols for this capability. Agent schemas remain the contract.

SymbolQuantityUnitRole
formulaoutput
api_versionoutput
api_contract_versionoutput
spec_versionoutput
pageCanonical calculator page URLoutput
linksoutput

Assumptions / Validity

Declared scope for this capability. Do not use it outside this domain.

Assumptions

Example

One numerical check. The calculator page holds worked steps and FAQ.

1000 W × 4 h/day × 30 days × $0.15/kWh = $18

Open this example in the calculator

Trust

CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance. Computational verification is defined by CVP. Supplemental domain review (internal) and named expert review are defined by the Review policy and do not by themselves determine CVP conformance.

CVP
CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance· View Manifest · CVP overview · Specification
Assurance
Engineering
Declared partition coverage
PASS · 3/3 declared partitions (watts, kwh, invalid-domain)
Calculation version
1.4.2
Verification
28/28 calculation tests · 10/10 legacy golden · 13/13 legacy boundary · 5/5 legacy property
Production surface contract
4/4
Versions
Calculation 1.4.2 · CVP protocol 1.0.0-proposed · Evidence 2026-09-13.ssr-dollar-literal
Verification revision
2026-09-13.ssr-dollar-literal · 5/5 property · digest b2d8bb7116f1
Reference
O1 model · O2 expected_values · O2 numerical_behavior
Interfaces
PASS · UI (SSR) / REST / MCP
ui-ssr is query-result HTML, not a live browser session. Public share URLs use UI ids (powerInput/hoursInput/daysInput/kwhInput/rateInput). CVP-IFACE includes those serialized queries, not only canonical engine keys.
CVP suite
2/2 golden · 12/12 CVP boundary · 21/21 invalid · 5/5 property · 3/3 cross-interface · 4/4 CVP contract
Supplemental domain review
Internal · Pass · electrical-engineer
Named expert review
Not performed
Version lock
Supported (409 VERSION_MISMATCH)
Artifact consistency
Build verified · 1.4.2 (workspace artifacts agree)
Review-policy tier
Internally reviewed — catalog token internally_reviewed; supplemental; not CVP status
This calculator CURRENT · Public schema 1.4.2 matches · Semantic contract ✓ · Production attested · Public/cache ✓ · Origin ✓

Call this capability

Human page, REST, and MCP share the same engine and calculation_version. Build verified hashes workspace artifacts only. After deploy, attest:production GETs canonical URLs twice — the public/cached view an Agent actually hits, and origin — including every /capabilities/{id} HTML page. Public Capability HTML version must match catalog before production attestation passes. Live Trust rows above fetch /.well-known/calculatorx-production-attestation.json and the output schema const. Build hashes: release integrity. That proves currently published page / engine / schema / evidence / MCP agree — not that a historical version is independently immutable. Reference Calculation Standard — Production surface contract 4/4.

Tool id
energy-cost
Engine
energy-cost
REST
POST /api/v1/calc/energy-cost
MCP
execute_calculation with capability_id: "electrical.energy_cost"
Agent input schema
Canonical (MCP / Agent)
Output schema
JSON Schema (latest)
Versioned input schema
Immutable pin (1.4.2)
Versioned output schema
Immutable pin (1.4.2)

Operations

Declared calculation modes for this capability.

References

Human-readable sources plus CVP reference evidence classes.

Sources

Reference evidence classes: O1 model · O2 expected_values · O2 numerical_behavior

Try with an agent

Inspect this capability via same-origin MCP, then call execute_calculation.

curl -sS -X POST 'https://www.calculatorx.com/mcp' \
  -H 'Content-Type: application/json' \
  -H 'MCP-Protocol-Version: 2026-07-28' \
  -H 'Mcp-Method: tools/call' \
  -H 'Mcp-Name: inspect_capability' \
  -d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"inspect_capability","arguments":{"capability_id":"electrical.energy_cost"}}}'

Inspect the trust tier and required assurance level before execution. Pin calculation_version (1.4.2) when reproducibility matters. Full protocol notes: MCP docs.